美美女免费高清毛片视频

  1. Home
  2. Investors
  3. Upstream major projects
  4. 2018 Upstream major projects
  5. Atoll Phase 1, Egypt

Atoll Phase 1, Egypt

Completed: 2 December 2017

~45 mboed peak annual average production, net to BP
Atoll Phase 1, Egypt
“BP is focused on delivering growth with discipline, carefully choosing and efficiently executing high-quality projects. The longstanding partnerships we have in Egypt allowed us to fast-track Atoll’s development and deliver first gas only 33 months after discovery. This is a further demonstration of our commitment to help realise Egypt’s oil and gas potential and meet the increasing demand from its growing population.”
?

Bob Dudley, BP group chief executive

BP announced the Atoll discovery in March 2015. The main reservoir in the field contains an estimated 1.5 trillion cubic feet of gas and 31 million barrels of condensates, and further segments are under evaluation.

The Atoll Phase 1 project is an early production scheme involving the recompletion of an existing exploration well as a producing well, the drilling of two additional wells, the installation of the necessary subsea infrastructure, and upgrading of existing onshore facilities required to produce from the field.

The Atoll project was delivered 33 months after discovery, with test production starting on 2 December 2017, seven months ahead of the original plan. The project will produce up to 350 million standard cubic feet a day (mmscfd) gas and 10,000 barrels per day (bpd) condensate, which will be processed at the West Harbour facilities and fed into Egypt's national grid.

Location  Egypt
Operator Pharaonic Petroleum Company (PhPC)
Partners BP (100%)
Project type Conventional gas
Peak annual average production
~65 mboed(gross)
~45 mboed (net)
Atoll Phase 1, Egypt

Atoll’s exploration well reached 6400 metres in depth in 2015. That’s drilling further than the height of Mount Kilimanjaro (5,895 metres).

Atoll Phase 1, Egypt

Atoll’s wells on the seabed connect to new and existing production facilities. That subsea tieback is BP’s longest on record at 110 kilometres, almost as far as the distance between the Egyptian cities of Cairo and Suez.

Atoll Phase 1, Egypt

The Atoll project was delivered 33 months from discovery and seven months ahead of original plan.

Gallery

Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
美美女免费高清毛片视频,天天干,天天操,天天射,天天好逼网,美美女免费高清毛片视频网 一级美美女免费高清毛片视频影片 夫妻性生活影片 免费美美女免费高清毛片视频 美美女免费高清毛片视频 美美女免费高清毛片视频_国产在线小视频_美美女免费高清毛片视频_美美女免费高清毛片视频美美女免费高清毛片视频 2018在线国产偷拍视频_偷拍久久国产视频_美美女免费高清毛片视频国产在线国产 美美女免费高清毛片视频,美美女免费高清毛片视频,国产成人美美女免费高清毛片视频亚洲美美女免费高清毛片视频 av天堂 av电影 美美女免费高清毛片视频 美美女免费高清毛片视频 av在线 美美女免费高清毛片视频 日本av 美美女免费高清毛片视频 久久美美女免费高清毛片视频美美女免费高清毛片视频_久草美美女免费高清毛片视频_久草在线美美女免费高清毛片视频-首页 日本高清美美女免费高清毛片视频网站_青青在线是美美女免费高清毛片视频观看_免费看黄色